|
|
|||||||
The winch is connected to the one ender and pushed down the pipe with rods in its closed position. (diameter 50mm) then opened to its full size set at 90mm. 95mm. 100mm. and winched back to the access point (manhole). This will re-round/re-form failed liners. Plastic, clay displayed joints (up to 20% displaced) pitch fibre up to 50% deformed. The one ender is also available in 140mm. 145mm. 150mm. |
|
| Fig.1 Closed positions at 75mm & 50mm |
![]() |
| Fig .2 Open position 150mm (6”) & 100mm (4”) |
![]() |
| Fig. 3 Set at 90mm diameter: Components. |
![]() |
| Fig. 4 Adjusted to 95mm & 40mm diameter. |
![]() |
| Fig. 5 Single entry tool. |
![]() |
copyright © Tolverth Limited
- Fax: 00 44 (0) 1736 788817 Mob: 00 44 (0) 773 750 0607 e-mail: Tolverth@aol.com |